Pool & Spa Permits in Minneapolis, Minnesota
30 pool & spa permits filed recently
30 permits
(DMH- Pdox) INSULATION REMOVAL AND REPLACEMENT IN SFD. NO PLAN. SEE SCOPE BELOW.- 2020 MNSBC A) Extract all insulation in attic and haul away B) Install air chutes in every rafter space where accessib...
36th floor white box demo and remodel bathrooms. separate permits required for buildout of tenant space(s) certificate of occupancy required: no const type: 1a occupancy: b 2020 MSBC sprinklered: yes...
remodel - nail salon. space 105. certificate of occupancy required: no const type: 4ht occupancy: B 2020 MSBC sprinklered: yes sac: _0_ charges __ met council letter dated _2/11/26_ architect: omara #...
Remodel existing office space -ACW certificate of occupancy required: no special inspections required: no occupancy: B 2020 MSBC sprinklered: yes Tenant: GHR Foundation Floor(s): 1 of 40 SAC: charge:...
Add office in existing space (related to BLDG1158381) -ACW certificate of occupancy required: no special inspections required: no const type: I-A occupancy:B 2020 MSBC occupant load: 80 sprinklered: y...
Remodel portion of office space -ACW certificate of occupancy required: no special inspections required: no const type: IA 2020 MSBC Tenant: Taft Floor(s): 1 architect: Mary Hustad
construct new single story detached garage with non-habitable attic storage space. attic storage is non-habitable and cannot be converted to any habitable space/use in the future due to floating slab...
(DMH-Pdox) FINISH 2ND LEVEL ATTIC SPACE FOR BEDROOM AND 3/4 BATHROOM IN SFD. SPRAY FOAM INSULATIONS. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATI...
T/I 'FADED BARBER SHOP' (4/3/26: A Certificate of Occupancy is required for this buildout, as it is the first documented tenant in this space. Adam Barthel, District Supervisor) const type: IA occupan...
Non-structural alterations at unfinished basement of sfd for water/moisture control. install "cleanspace" wall liner system by complete basement systems at nw corner of block foundation walls, install...
Tenant Improvement - Suite 120 - All's Well Spa Shell permit 718023 CERTIFICATE OF OCCUPANCY REQUIRED - AN AUTHORIZED REPRESENTATIVE OF THE PERMIT APPLICANT MUST CALL 612-673-2327 TO SCHEDULE A CERTIF...
Installation of Brava Spanish Tile on House and Garage
Remodel existing living room to create new case opening on load bearing wall and add new beam in existing single family house. aaj (project dox plans). - remove 8'6" span of load bearing wall as noted...
Build an additional office room next to the kitchen and conference room. certificate of occupancy required: no const type: 2b occupancy: b 2020 MSBC sprinklered: yes architect: gaspar #16430
install crawlspace insulation and drainage. 220 ft of vapor barrier, 156ft of drainage matting, 32ft of spray foam & 64 ft of Foamax. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CH...
Tenant remodel of office space on 6th floor -ACW certificate of occupancy required: no special inspections required: no const type: IIIB occupancy: B 2020 MSBC occupant load: 7 sprinklered: yes Tenant...
Tenant remodel of existing space -ACW certificate of occupancy required: no special inspections required: no occupancy: B 2020 MSBC occupant load: 12 sprinklered: yes Floor(s): 1st SAC: charge: 2.47,...
REINFORCE EXISTING FLOOR JOISTS. NO CHANGE TO LAYOUT OF EXISTING SPACE ABOVE. (JJL) ALL JOISTS THAT ARE 198 INCHES IN LENGTH TO BY SYP #1 OR BETTER. ADD (2) 2X8 AT JOISTS #1, #3, AND #4. Building Code...
Remodel existing first floor spaces in to restaurant. first floor currently m and b occupancy. level 1 change of occupancy to a2. add sprinkler to first floor. r2 at levels above. 1 hour separation be...
ATTIC REMODEL - INSTALL PARTITION WALL FRAMING AND 1/2" GYP BOARD FINISHES TO ENCLOSE APPROX. 12'x14' FINISHED SPACE, CLOSET, AND 6'X7' BATHROOM, REPLACE THREE WINDOWS - ONE EGRESS WINDOW AND SAFETY G...