Claremont Bldg 4, Exterior Retaining Wall Reconstruction: Excavation/Placement/Compaction of existing landscaping, paving, backfill/soil fill and overburden/fill behind existing retaining walls. Insta...
Installation of new Walk-in freezer equipment & refrigerant lines
Installation of new Walk-in freezer equipment & refrigerant lines
Installation of temporary construction fence as per plan. no change in use, egress, or occupancy. the plywood fence attached to the outer sidewalk shed bridge will be solid plywood and wire mesh.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
support of excavation as shown on plans filed herewith.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sh/ps107x - for temporary construction equipment (shed) submitting on behalf of contractor, related with dob#x00824983 no change in use, occupancy or egress
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
foundation and structural work associated with the proposed earthwork and change of occupancy, as shown on plans filed herewith.
Proposed minor duplex extension on existing 2 story & basement 3 apartments building, adding a minor duplex to 2nd floor apartment, building will stay as a 3 family, proposed new certificate of occupa...
Installation of temporary plywood fence as per plan. no change in use,egress, or occupancy.
Installation of temporary overhead protection as per plan. no change in use, egress, or occupancy
Claremont Bldg 4, Exterior Retaining Wall Reconstruction: Excavation/Placement/Compaction of existing landscaping, paving, backfill/soil fill and overburden/fill behind existing retaining walls. Insta...
Proposed of grinding and pointing, brick replacement and parapet wall as needed as per plans. there is no change in use occupancy or egress under this application.