Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 49 west 225 streetbronx, ny 10463.
Installation of 300 psf sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installatiion of new wall mounted ac unit and exhaust fan ductwork modifications in elevator machine room
New concrete pad in exterior patio. no change of use, egress or occupancy.
X186_Remove existing ramps and replace with new ADA compliant concrete ramps. Provide new wheelchair vertical lift and ADA seating in auditorium, ADA compliant doors at classrooms. Modify existing roo...
Facade restoration as per plans submittd herewith, no change in use, occupancy or egress.
General construction to OSP as per plans filed herewith. No change in use, egress, or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Sh/ps104x - for temporary construction equipment(emergency shed) submitting on behalf of contractor, in conjunction with llw#130994 no change in use, occupancy or egress
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Herewith filing Mechanical and OT-Lighting for new school building
Installation of new sidewalk shed at 2015 southern blvd, bronx as per plans. there will be no change in the use, egress, or occupancy under this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
filing herewith elevator modifications as per plans filed herewith.
Installatiion of new wall mounted ac unit and exhaust fan ductwork modifications in elevator machine room
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.