Other Permits in Bronx, New York
2,948 other permits filed recently
2,948 permits
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Filing herewith installation of deep foundation elements as indicated on plans. no change in use egress or occupancy
Installation of new sidewalk shed at 1039 evergreen avenue, bronx as indicated on plans. there will be no change in the use, egress, or occupancy under this application.
Proposed installation of temporary fence as per plans. no change in use occupancy or egress under this application.
Structural work related to raised floor assembly.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Convert one hotel room to one office.
Legalize vestibule enclosure at existing open porch area @ 2nd floor
Installation of 200 ft of Temporary Construction Fence , at the building , No change of Use or Egress Or Occupancy of the building.
Installation of suspended scaffold for facade work or inspection.
Installation and replacement of electric vehicle charging stations with bollards in 2nd floor parking garage. Removal, installation, replacement of charging cabinets with concrete pads and landscaping...
Installation of temporary sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of construction fence for public protection from areas of work during construction work.
Installation of heavy duty side walk shed.as per plan.
File suspended scaffold outrigger systems for facade restoration and inspection.
Modification of ductwork and installation of (2) ac units.
Install construction fence as per plans
Construction fence