Renovation Permits in Bronx, New York
805 renovation permits filed recently
805 permits
provide new concrete pads for new Condensate return units and columns repairs as per plans.
Heavy duty sidewalk shed during bldg alteration, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Application filed herewith for fisp/facade repairs work as shown on plans submitted. no change in use,egress or occupancy under this application
Heavy duty sidewalk shed during exterior facade repairs filed under application # x01208243-s4. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this a...
Facade repairs as per plans filed herewith. No change in egress, use or occupancy.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Propose to patch , repair and resurface existing parking lot existing co#33264
File to address ECB violation #035486400J & HPD violations. Propose interior renovation at cellar of existing residential building with finish work as per plan. No change in use, egress, or occupancy.
Structural application filed in conjunction to the alteration co application
Facade repairs as per plans filed herewith. No change in egress, use or occupancy.
Propose to patch , repair and resurface existing parking lot existing co#33264
Minor renovation to existing bank branch including the construction of new full height partition to enclose private office. No change in use, egress or occupancy.
Structural application filed in conjunction to the alteration co application
File to address ECB violation #035486400J & HPD violations. Propose interior renovation at cellar of existing residential building with finish work as per plan. No change in use, egress, or occupancy.
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Fuel Storage MULTI-COMPONENT RENOVATION (FDNY EC82 PHASE 2). REMOVAL AND REPLACEMENT OF DISEL FUEL DISPENSING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Facade Repairs as per plans filed herewith. No change to use, egress, or occupancy.
Fuel Storage MULTI-COMPONENT RENOVATION (FDNY EC82 PHASE 2). REMOVAL AND REPLACEMENT OF DISEL FUEL DISPENSING SYSTEM. NO CHANGE OF USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.