Renovation Permits in Bronx, New York
801 renovation permits filed recently
801 permits
Heavy duty sidewalk shed during exterior facade repairs filed under application # x01208265. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this appl...
Facade repairs to comply with local law 11. no change in use, egress or occupancy.
Application herewith filed for vertical and horizontal enlargement of existing 1 story and cellar wood frame building to include interior renovation of existing first floor and cellar. this detached b...
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Interior renovation for an existing dunkin dounts service restaurant @1st. floor. Minor upgrades to exterior facade through painted finishes and material upgrades. No change in use, egress and occupan...
Mechanical work associated with the proposed renovation and change of occupancy, as shown on plans filed herewith.
The scope of the structural work is strictly repair and maintenance from normal wear and tear. the structural design work does not constitute a change of use or addition to the existing building.
Jacobi Medical Center proposed interior renovation of an MRI on third floor. No change in use, egress or occupancy. All as per plans filed herewith.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Mechanical work associated with the proposed renovation and change of occupancy, as shown on plans filed herewith.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Repair ex.open porch q.deck with conc.and front step with brick and fixed lose entrance canopy wood column .lifting vacant order and lift ecb vio.39149907r 39149917k & 39149920l .
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Outriggers system installation for facade repairs, no change in use, egress, or occupancy.
The scope of the structural work is strictly repair and maintenance from normal wear and tear. the structural design work does not constitute a change of use or addition to the existing building.