Application is filed for the installation of ductless replacement hvac units at first floor elevator machine roof and roof, as per plans submitted herewith. no change to use, egress or occupancy of bu...
Renovation for existing 3-Story building and replacement of fire damaged roof floor.
Installation of temporary heavy duty sidewalk shed during roof and facade restoration (DOB Now # X01079962) per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use,...
Modification to existing T-Mobile site. Relocate existing equipment platform and cabinets away from exposure #1 on the roof.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Extend fire scape to roof at North and South towers
extend fire escape stairs to roof
Ps 129x, installation of +/- 324 linear feet of chain link fence, +/- 13 linear feet of sidewalk shed, and 40 square feet of scaffold (on the roof) in conjunction with dob # 201207853. no change in us...
extend fire escape stairs to roof
Extend fire scape to roof at North and South towers
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Modification to existing T-Mobile site. Relocate existing equipment platform and cabinets away from exposure #1 on the roof.
Filing for Facade Repair work that includes replacement of parapet walls, brick masonry and waterproofing repairs, steel lintel replacement, cut and point mortar joints, etc. as per plansfiled herewit...
Installation of 300 psf sidewalk shed, ohp, yodocks, fence, pipe scaffolding, window protection and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no chang...
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Application being filed to temporary repair section of existing roof under emergency declaration outlined in dob violation #120125cfeu20401bp due to fire and water damage which occurred on 11/28/2025....
Application being filed for temporary shoring/bracing to stabilize a section of the roof above apt 6g & 6h affected by fire damage. no change in use, egress or occupancy.
Application being filed for temporary shoring/bracing to stabilize a section of the roof above apt 6g & 6h affected by fire damage. no change in use, egress or occupancy.
Filing for Facade Repair work that includes replacement of parapet walls, brick masonry and waterproofing repairs, steel lintel replacement, cut and point mortar joints, etc. as per plansfiled herewit...
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.