663 issued permits in Bedford-Stuyvesant (East), part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
663 permits
Remove and install new walk-in frezer. Construct gyp. bd chase on 2nd, 3rd, and 4th floor. Install new condenser unit on roof.
Imc 9fl: plumbing, sprinkler and standpipe modifications to accommodate alteration to the behavioral healt unit as per plans. no change to use, egress or occupancy
herewith filed for the construction of an 8 ft plywood construction fence
1. remove the sheet rock in the walls and ceiling throughout in the 1st & 2nd floor.2. install new sheet rock in the all walls and ceiling throughout in the 1st & 2nd floor.
Refile existing expired approved plans, show as-built conditions and obtain a new certificate of occupancy
Installation of supported scaffold for work locations access.
To file ms worktype for a new split unit at the 3rd floor roof and 1st fl. retail. no change in use, egress, or occupancy under this application.
Filing plans herewith for the installation of delivery lockers. No change to use, egress, or occupancy.
Ot- remove & install new partitions, doors, ceiling & finishes. install elevator. replaceexisting & install new ada ramp on grade. st- remove portion of exist. floor slabs & beams…
Exterior Facade Repair
Install beta-max hoist. beta-max hoist to lift material for exterior facade repairs. sidewalk shed filed under separate application.
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as beingapproved and/or permitted by the nyc departm…