746 issued permits in Bedford-Stuyvesant (West), part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
746 permits
Existing 2 family building with interior renovation with partitionwork at the cellar, basement,1st, 2nd ,3rd floor and open space in the rear yard under this application.2. no chan…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Interior residential renovation to a 2 family residence.
Proposing new 8 story and celler residential building.
New 2 family 4 story with cellar building
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
K305- New installation of first floor perimeter security lighting. As per plans filed herewith.
K305 Remove & replace existing windows throughout school and 4 bulk head doors Replacement on the roof level, As per plans .minor patching of interior windows plaster work. Window…
Interior renovation of an existing two family house as per the plans filed herewith. No change in use, egress or occupancy.
Existing two-family house with plumbing work at cellar, basement, 1 st, 2nd & 3rd floor. job filed to related to alt2application # b01374099-i1.2. no change in use, means of egress…
K305 exterior masonry repairs, existing parapets replacement in kind & existng roof replacement in kind work. interior plaster work and repair & paintng.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.