746 issued permits in Bedford-Stuyvesant (West), part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
746 permits
Application filed herewith for installation of a temporary construction fence
Renovation of cellar mechanical equipment room - nycha boilers
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Installation ofthe newconcrete padsfor mech.equipment intank rooms andboilerroom.createnew opening inthe exterior masonry walls. repair various concrete elements ofthetank roomsand…
Nycha lafayette houses (building #2), installation of temporary stack connected to mobile boilers and mounted on the facade in conjunction with dob # b00994757 and b01280426. no ch…
Installation of the new concrete pads for mech. equipment in tank rooms. installation of new concrete area ways at tank rooms. extension of existing sump pit.
Nycha lafayette houses - building #2, installation of +/- 700 linear feet of temporary 8 feet high chain link fence submitting on behalf of contractor in conjunction with dob # b00…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed 8ft construction fence. no change to use, egress or occupancy under this application.
Renovation of cellar boiler room - nycha boilers. work includes -install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes.
Renovation of cellar mechanical equipment room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishe…
Filing mechanical application in conjunction with the boiler application B00845076-Z9.
Propose Mechanical Work filed in conjunction with NB-GC # B08005364-I1.
Alteration for enlargement to existing 2 story + bas, proposed 6 story + cellar residential use building.
Installation of the new concrete pads for mech. equipment in tank rooms and boiler room.create new opening in the exterior masonry walls.repair various concrete elements of the tan…
Propose new 4-story plus cellar multi-family residential building as per plan. obtain new c of o.
Partial demolition on existing two-family four-story frame residential building with basment & cellar.no change of building bulk,occupancy or egress.
Installation of rear yard shallow and new footing in basement