499 issued permits in Downtown Brooklyn-DUMBO-Boerum Hill, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
499 permits
Foundation work to install new concrete footing for proposed elevator pit as per plans filed herewith. no change to use, egress or occupancy.
Structural work as per plans filed herewith. no change to use, egress or occupancy.
Rehabilitate and reconstruct facade limestone wall panels, and coping stones at parapet walls. Exterior removals/replacements as shown on plans filed herewith.
Proposed multi-story mixed-use building total of 99 dwelling units & general retail
Install exterior illuminated wall sign ( free people)
Application filed for installation of sprinkler heads as per plans. filed in conjunction with alt 22, no change in use occupancy or egress
Installation of mechanical system for entire building in conjunction with alt 1 application # b01103348. no change in use, egress or occupancy.
Modification of mechanical systems and associated ductwork.
Install exterior non-illuminated blade sign ( free people)
Alteration of an existing two bedroom apartment. New non-structural partitions, and interior finishes. No change to exterior or windows of building. No change in number of bedrooms…
Mechanical work to accommodate the new 22 story jail building.
Structural work as indicated on plans filed herewith. No change of use, egress or occupancy.
Structure filed in conjunction with nb job number b00741148-i1.
Proposed temporary 8' plywood construction fence
Soe filed in conjuntion with nb job number b00741148-i1.
Install of platform, truss, partition, sculpture, inflatable. no alt to exist structures for FIFA World Cup at BK Bridge Park. TPA req. Producer responsible to monitor site safety…
Minor exterior repair including brick replacement, minor concrete patching, minor stone patching among other work included in plans attached herewith. no change to use, egress or o…
Structural work associated with coffee house fit out
Installation of temporary pipe & system scaffold as per plans. no change in use, egress or occupancy.
Alteration to ground retail space. removal of entry access stair, addition of ada lift at entry, modification of existing stair to add compliant handrails, removal of ext raised wo…