499 issued permits in Downtown Brooklyn-DUMBO-Boerum Hill, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
499 permits
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of temporary overhead protection per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applica…
Building #28: installation of temporary shoring as per plans.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
Installation of plumbing and sprinkler system as per plans submitted herewith in conjunction with b01171197-i1
Temporary roof / overhead protection at adjoining properties during new building const, filed sep. roof / overhead protection shall comply with ch #33 of the nyc bc. no change in u…
Mh scope related to fit out as per plans filed herewith. no chnage to use, egress nor occupancy.
Filing for underpinning of existing 1 family foundation at cellar level.
Sprinkler work related to the tenant fit-out of unit 1d. no change to use occupancy or egress.
Interior tenant fit-out of existing partial ground floor community facility space, including new non-load bearing interior partitions and relocation of existing bathrooms. no chang…
Structural work filed for replacement of rear building facade
General construction for interior fit out as per plans filed herewith, no chnage to use, egress nor occupancy.