645 issued permits in Downtown Brooklyn-DUMBO-Boerum Hill, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
645 permits
Proposed fitness establishment on the cellar floor. change of use. no change on egress or occupancy. no work proposed.
Request assignment to the HUB. Consult requested 07/22/22. Application filed to construct new 7 story residential building
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Install (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Install new gas piping for (4) replacement boilers as per plans. no change in use, occupancy, or egress.
Installation of a personnel hoist as per plans in conjunction with nb construction. no change in use, egress or occupancy under this application. hoist installed in accordance with…
Minor renovation to existing cellar. no change to egress, use, or occupancy.
Emergency concrete repairs to the interior of an existing building in the cellar. emergency repair of existingstructural elements column #121, beams and slab at the main entrance o…
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Interior non-structural demolition and general construction as shown on plans filed herewith at unit 6a. scope of work includes interior partition, millwork installation, lighting…
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installing a concrete placing pump along with the required shoring and supports extending throughout the full height of the building.