832 issued permits in Park Slope, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
832 permits
Reinforce/replace ground floor framing members
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Mechanical work on basement,1st, 2nd, 3rd floor & roof. no change in egress, use or occupancy.
Structural scope in conjunction with horizontal and vertical addition of existing 3 story + cellar building as per plans filed herewith. no change to use, egress, or occupancy.
Foundation scope in conjunction with horizontal and vertical addition of existing 3 story + cellar building as per plans filed herewith. no change to use, egress, or occupancy.
Support and excavation work for partial demo of existing rear wall for extension into rear yard and the lowering of cellar as per plans filed herewith.
Installation of temporary sidewalk shed as per plan. no change in use, egress or occupancy.
Installation of temporary overhead protection as per plan. no change in use, egress or occupancy.
Subsequent filing for sturctural work in conjunction with gc job#b01262206-i1.
Construction of new isolated concrete footing, rear mat slab and retaining wall. and earth work at rear well.
Installation of temporary roof protection as per plan. no change in use, egress or occupancy.
Installation of solar pv system. no change to use, egress, or occupancy.
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Propose to repoint rear cellar, basement, first and second floor facade and powerwash existing brick. remove existing railing on second floor roof terrace, as per plans filed herew…
Plumbing and sprikler scope of work in conjunction with horizontal and vertical addition of existing 2 story + basement + cellar building as per plans filed herewith. no change to…
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Interior Alteration work at basement and cellar floors only, including legalization of existing non-structural work and new proposed interior renovations. The filing addresses DOB…
Herewith filing mechanical modifications for NYU Langone Health Rooftop Unit Replacement project. No change in use, egress, or occupancy.