670 issued permits in Park Slope, part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
670 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Apt 5c work includes replacement of kitchen and laundry fixtures, reconfiguration of 2 bathrooms.
Installation of fully sprinkler system as required per application. no change in use, occupancy & egress.
Hereby filing for the combination/renovation of two existing studio apartment units, unit 8 and 10. no change, in use, egress or occupancy.
Full demolition to a two story house
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Plumbing work in existing 2-story with basement and cellar, 1 family building in conjunction with alt 2 application # b01266034. no change in use, means of egress or occupancy in t…
Mechanical modifications to apt 5c
Installation of a temporarily heavy-duty sidewalk per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this app…
This application is being filed to enclose lot line windows located on the east facade of the building due to the erection of a new building on 34 Garfield place. Required light an…
File soe application in conjunction with alt-co job#: b01333669-i1.
BMH SP Carrington Pav: Sprinkler modifications within the existing Hospital as per plans filed herewith. No change to zoning, use or egress
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of solar panels, rooftop, railed, grid-tied, 7 modules, 2.87kw
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 per square feet. sidewalk shed shall comply with chapter # 33 of the 2014 code. no change in use occup…
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Cap and remove 3 stoves related to change of use from 6 family to 3 family filed under job # B00958038-I1. Replace 2 additional gas stoves with electric.
Plumbing work for a duplex unit. No change in use, egress, or occupancy