401 issued permits in Sunset Park (West), part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
401 permits
Interior renovation of an existing 3-story building, conversion from two-family to a one-family dwelling as shown in plans. proposed vertical and horizontal enlargement. obtain a n…
Installation of temporary construction fence in conjunction with dob now application #b01182775-i1. fence shall comply with chapter 33 of the nyc building code.
interior & exterior renovation of exist. building with repair ceiling, replace floor, stair, new partition, door, painting, and install new AC units work, no change in use, egress…
Renovation of exist. residential house, repair/replace/new partition, door, ceiling, floor, stair, painting, canopy, roof as per plan. no change in use, egress or occupancy.
Installation of temporary construction fence in conjunction with dob now application #b01091624-i1. fence shall comply with chapter 33 of the nyc building code.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing, Sprinkler and Standpipe applications in conjunction with new building.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Modification to Verizon site. Remove 2 antennas, replace 2 antennas, install 7 antennas, remove 4 RRH units, relocate 2 GPS antennas and install 2 GPS antennas, remove cabinet, ins…
Interior renovation in existing commercial space U.G. 6 on partial first floor. Replace store front as per plan. No change in use, egress, occupancy, lot coverage, bulk or metes an…
Temporary systems scaffold as per drawings. systems scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
File to plumbing as per plan, conjunction gc application #b01380259-i1 . no change in use, egress or occupancy.
Installation of a temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence to comply with 2022 nyc building code,…