401 issued permits in Sunset Park (West), part of Brooklyn, New York. Refreshed every 6 hours from the city's public permit feed.
401 permits
Installing temporary fence of exist. 3 story commercial building , horizontal & vertical enlargement, this application is in conjunction with dob job application 321383800. obtain…
install a new residential boiler. all work done under #B01216357-I1
Plumbing work in conjunction with the removal of boilers under application B01322968-I1 and the installation of new boilers under applications B01322981-I1 and B01322994-I1.
Remove existing water heaters/boiler ducting piping wiring and controls for the duration of foundation upgrades. Reinstall existing water heaters/boiler ducting piping wiring and c…
Herewith filing sprinkler modifications for generator plant upgrade, nyu langonehealth. no change in use, egress, or occupancy. 39 new sprinklers to be installed
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Installation of 300 psf sidewalk shed, pipe scaffold, needle beam and system beam as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egre…
Installation of temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application…
Alt co filing - general construction for u.g. vi heavyautomovtive repair and manufacturing paint spraying andpaint storage and vii professional office.
Relocate (1) stove and (1) sink at 1st floor, 2nd floor and 3rd floor. No change in use, occupancy or egress.
interior renovation of existing commercial space on the 5th floor only. architectural / construction work only
Installation of a temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Proposed new 18' curb cut along 43rd street, as per plans filed herewith
New exterior ramp for ada access as per plans filed herewith
Installation of temporary needle beam as per plans. no change in use, egress or occupancy.
Installation of a temporarily supported scaffold and overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or…
The scope of work consists of removing two existing toilets, installing new commercial sinks and a water heater, and relocating the existing toilet.