5,617 other permits filed recently
5,617 permits
Install temporary construction fence as shown on the plans. no change in use, egress, or occupancy under this application.
Filing for temporary construction fence
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of construction fence
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Hereby filing sump pit related to elevator rehabilitation.
Filing for cast in place concrete isolated pier and spread footing foundation for new steel deck in rear yard, that includes cast in place frost wall and strip footing for stair la…
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Install temporary construction fence for alt-2 enlargement job filedunder dob # b01266034-i1
Installation of pipe scaffolding as per plans. all equipment shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
install fence for construction work in conjunction to B01038276-I1 , B00947789-I1, B00947882-I1
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an…
Sprinkler application filed subsequent to Alt GC application: B01112226-I1.
Subsequent structural application in conjunction with approved gc #b01183847-i1
install fence for construction work in conjunction to B00947796-I1, B01038287-I1, B00947884-I1
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Proposed 8 story residential building
Installation of an 8' high wood construction fence. no change to use, egress or occupancy.
Installation of temporary construction fence .