5,735 other permits filed recently
5,735 permits
Temporary construction fence installation to be erected during construction operations
HEREBY FILING FOR THE REMOVAL AND INSTALLATION OF SPRINKLER HEADS. NO CHANGE TO USE, OCCUPANCY OR EGRESS. (Tenant building out - 449 5th Ave - In Conjunction with ALT-CO B00668652-I1)
Filing for fence application , installation of 8' - 0'' plywood construction fence.
Filing for structural work forextension approved under job numberb01143850-i1; filing to remove steel beam serected for 6th floor; there will be no change to use, egress of occupancy.
Minor partition work as per plans
Installation of 8ft construction Fence.
Proposed removal of existing portion abutting existing garage. Existing garage to remain.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Sprinkler work for tenant fit-out in retail c + d
Insstall 8ft plywood fence at inside property line at front and rear yard
Installation of floor/ceiling joists and metal stud walls as per drawings herein. no change in use, egress, or occupancy under this application.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
It is proposed to file for structural work as shown on plans.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Replacement of curb valves
Temporary construction fence required for storefront replacement work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Install soldier pile and lagging for support of excavation for the proposed 4-story building in conjunction with alt1 job # b01187876-i1.
Installation of temporary pipe scaffold & system scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary engineered enclosure system as per plans. no change in use, egress or occupancy.