1,126 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,126 permits
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Non-illuminated non-advertising accessory wall sign - joe & the juice. no change of use, egress or occupancy.
Interior and exterior renovations to existing building including installation and replacement of finishes, minor masonry repairs and facade work. No change in use, egress or occupa…
Interior illuminated non-advertising accessory hanging sign - in property lines - (logo). no change of use, egress or occupancy.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Filing herewith sprinkler modifications to the existing system as per plans. no change to use egress or occupancy.
Replace gas boiler.
Filing for faade repairs work that includes repair of concrete balconies, repair of deteriorated sealants, application of coatings, etc. as shown on drawings filed herewith. No cha…
Sidewalk shed installation as per plans filed herewith.
Interior apartment 3a and 4a restoration as per plans
Filing for modifications to existing mechanical systems as per plans filed herewith. No change in use, egress, or occupancy.
Provide test caisson on site as per plans filed, application filed in conjunction with new building application m00696323. no change in use, occupancy, or egress.
Remove existing ductwork and refurbish existing ac units as part of upgrade of existing hvac and kitchen exhaust system at 5th floor cafe servery area as per plans filed herewith.…
Removal and installation of walls, doors, finishes, & lighting as per plans. construction of new bedroom from portion of former open living / dining. no change in use, occupancy or…
Install new VRF heat recovery fan coil units and connect to existing condensing unit, including associated ductwork. No change to occupancy, use or egress.
A scaffolding system that shall act as a protective enclosure for the use of Brokk for demolition operations within the job site.
Filing for the interior renovation at the 4th and 5th floor. Work includes removal and installation of interior non load bearing partitions, doors, finish work. No change to use, e…
Installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress or occupancy.
Install gas boiler