1,300 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,300 permits
Filing for the removal of interior partitions, equipment, package conveyance system, and finishes. No change in use, egress or occupancy.
Construction work on the cellar and 1st floor (landlord retail/lower level work) as indicated on drawings.
Installation of temporary p/m main hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter 33…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Filing for the removal of the interior partition work, storage units and the finishes. No change in use, egress or occupancy.
Installation of new plumbing and gas fixtures for the renovation of an existing restaurant as per plans. No change to use, egress, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
New plumbing fixture per plan for existing commercial space. no change in use, egress, or occupancy.
Propose to file for mechanical work for two (2) air-cooled packaged units with ductwork. No change to use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Install an internally illuminated accessory business wall sign on raceway jet set modern pilates
Hereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Interior renovation of existing apartment including the removal & installation of non-load bearing partitions, floor & wall finishes as per the drawings filed herein. no change in…
Filed herewith a new Sprinkler and Standpipe for a new building. Sprinkler as per NFPA 13 and Standpipe as per NFPA 14, as modified by BC Appendix Q.
Erior renovation of unit 2e including removal of non-load-bearing interior partitions in the kitchen area and installation of new steps leading to the sunken living room, installin…