1,300 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,300 permits
Mechanical filing as per plans. no change in use, egress or occupancy.
Filed herewith a new Sprinkler and Standpipe for a new building. Sprinkler as per NFPA 13 and Standpipe as per NFPA 14, as modified by BC Appendix Q.
Supported scaffold for work access. no change in use, egress, or occupancy.
Apt. 17B/C - cap/remove, replace, relocate and install plumbing fixtures
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior renovation including partition changes and new slab openings for vertical transportation systems. No change to use, egress, or occupancy.
Structural modifications on floors 2-7 and associated slab removals as per plans filed herewith. No changes in use, egress or occupancy.
Filing for the installation of a temporary fire sprinkler system for daycare space in cellar and first floors as per plans filed herewith. no change in egress, use or occupancy.
Plumbing and sprinkler work for the fit out of an apartment as per plans filed herewith. no change in use, egress, oroccupancy
Storage - removal and installation of sprinkler heads and related piping. installation of additonal standpipe main piping, riser and hose racks off existing standpipe water service…
Suspended scaffold for facade restoration as shown on plans
Proposed eleven (11) story + cellar mixed-use building. (Cellar, 001-010 construction floors, 11C/PENM)
Structural work for the renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Installation of non-load-bearing partitions as per plans. change of use, egress, and occupancy on l50 (construction 30)construction floors 30, 33 & 34 (tenant levels 50, 53 & 54).
Renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Erect non-illuminated projection banner non-flashing, non advertising sign barney brown as per drawing file herewith.
Installation of temporary p/m cellar hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter…
Suspended Scaffold for Inspection as Shown on Plans