Temporary structure for an WNBA event at HY Plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Remove misc. non load bearing partitions, ceiling tiles and flooring as per plans
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Scope of work is solely for the installation of the solar electronic generating system. all other work is not to be relied upon as being approved and/or permitted by the nyc depart…
Suspended Scaffold Installation as per plans filed herewith. No change in use, egress or occupancy.
Installation of 335' lf heavy duty sidewalk shed as per plans rated for 300 psf & 600 psf debris and material storage. no change to egress, use, or occupancy.
Mechanial filing as per plans. install split a/c heating system. no change in use, egress or occupancy.
Installation of new gas meter and gas piping as per plans. No change to occupancy, use, or egress.
2026 Auto Show @ JJC - Nissan - Install a temporary exhibit within an existing exhibition building scheduled April 3rd-April 12th, 2026. No change of use, egress or occupancy under…
Modifications to existing Plumbing Fixtures as per plans filed herewith. No change in use, egress or occupancy.
Plumbing changes on the 7th, 8th and 9th floors as indicated on drawings.
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or oc…
Interior renovation of apt 2, 3, and 4. partition changes to non-load-bearing walls as per plans. no change in use, occupancy, or egress.
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupanc…