Plumbing changes on the 7th, 8th and 9th floors as indicated on drawings.
Facade repairs to include masonry replacement, repointing and crack repairs, concrete crack and patch repair. No change in use, egress or occupancy.
Installation of non-emergency gas fired generator with related gas booster pump on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occupanc…
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Installation of temporary suspended scaffold equipment.
modify head location and branch piping to accommodate layout changes
In Unit 6B on floor 6, removal and installation of non-loadbearing partitions as shown on plans. All plumbing work filed under separate application. No change to egress, use, or oc…
11 story, 21 dwellings new building
Mechanical system for 19 dwelling new building
Mechanical modifications taking place at cellar, 1st, 2nd, and roof as per plans filed herewith. no change in use, egress, or occupancy.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Hereby filing for the removal, replacement and relocation of plumbing fixtures in apartment 5n located on the fifth floor. no change touse occupancy or egress.
Proposed exterior facade repair (parapet, lintel, caulking, brick replacement, masonry, mortar joint pointing) no structural changes as per plans. no change in use egress or occupa…
Installation of new partitions for gas piping installation as per plans. Installation of new partitions and door with damper on 1st floor. No change to occupancy, use, or egress.
Perform selective removal work, provide new HVAC equip & assoc ductwork, piping, controls, accessories, etc. Protect & reuse existing equipment as shown on plans. Application filed…
2026 Auto Show @ JJC - Volkswagen - Install a temporary exhibit within an existing exhibition building scheduled April 3rd-April 12th, 2026. No change of use, egress or occupancy u…
2026 Auto Show @ JJC - Toyota - Install a temporary exhibit within an existing exhibition building scheduled April 3rd-April 12th, 2026. No change of use, egress or occupancy under…
Modifications to existing mechanical systems and associated ducts and piping as per plans filed herewith. no change in use, egress, or occupancy.
Hereby filing for the interior renovation of existing apartment 5n located on the fifth floor. no change to use occupancy or egress.
Furnish and install new supplementary steel for garage roof opening for new chimney liner. no change to use, egress, or occupancy.