CleanSpace to install a temporary exhibit within an existing exhibition building. CleanSpace Booth #2235 on LVL 3 / Exhibit Hall 3B for Interphex 2026. Scheduled construction 04/17…
Modification to existing plumbing systems and fixtures and sprinkler / standpipe systems and installation of new sprinkler heads as per plans filed herewith. 001, 005, 006, 008 C (…
Interior renovation of existing Apt. 4A, as per plans. No change to Use, Occupancy, or Egress.
Filing herewith mechanical plans to indicate mechanical ductwork as shown on plans. there will be no change of use, occupancy or egress under this application.
Sever connection between apts 1a and 1b on the first floor and recreation rooms on the cellar level. at the cellar level create bicycle storage, accessoory tenants laundry room and…
Addition of air curtain to existing hvac systems including ac unit, fans, duct heater, ductwork, accessories, etc.
Interior and exterior renovations to existing building including installation and replacement of finishes, minor masonry repairs and facade work. No change in use, egress or occupa…
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…
Filing for installation of HVAC units in Cellar and associated ducts and piping throughout Cellar to Floor 8 for future fit-out connections as per plans filed herewith. No change i…
basement unit #1 interior renovation
Installation of temporary foundation wall bracing for crane loads.
Full demolition to a four story building
Addition of a dedicated reclamation room exhaust system as per plans filed herewith. No change in use, egress or occupancy under this application.
Suspended Scaffold and hoist installation as per plans filed herewith.
Plumbing work related to the construction of a new 50 story commercial building as per plans filed herewith.
Partial interior renovation of unit THA at the first floor, installation of non-loadbearing partitions as shown in plans. No change to egress, use, or occupancy.
Office space renovation consisting of non-structural interior demolition and general construction as per plans filed herewith. no change to use, egress or occupancy under this appl…
Facade repair, masonry and railing replacement, concrete patching, lintel replacement as per plans filed. No change in use egress of occupancy.
The new ductwork and piping work on the 29th floor