Propose to file for mechanical work for two (2) air-cooled packaged units with ductwork. No change to use, egress or occupancy.
Construction work on the cellar and 1st floor (landlord retail/lower level work) as indicated on drawings.
Installation of temporary p/m main hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter 33…
New plumbing fixture per plan for existing commercial space. no change in use, egress, or occupancy.
Filing for the removal of interior partitions, equipment, package conveyance system, and finishes. No change in use, egress or occupancy.
Filing for the removal of the interior partition work, storage units and the finishes. No change in use, egress or occupancy.
Hereby filing to install mechanical units with associated ductwork and piping as part of tenant fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Installation of new plumbing and gas fixtures for the renovation of an existing restaurant as per plans. No change to use, egress, or occupancy.
Plumbing work as shown on plans
Installation of a temporarily shanty per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Temporary structures for The Shed cultural and event programing. Removed at the end of the programing. No changes to existing structures, use or egress
Mechanical work on the cellar and 1st floor (Spear Street Capital) as indicated on drawings.
Hereby filing to install mechanical units with associated ductwork and piping as part of lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of new water fixtures and relocation.
Hereby filing to construct interior partitions, ceilings and doors for for lobby fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing to construct interior partitions, ceilings and doors for for office fit out as shown on plans filed herewith. No change to use, occupancy or egress.
Install an internally illuminated accessory business wall sign on raceway jet set modern pilates
Installation and use of construction shanties at cellar and first floor levels as per plans filed herewith. This application is filed in conjunction with NB M08018629-I1.
Temporary Installations to be used on a temporary event Automotive Press Reveal. All the Installations are to be removed upon completion of the event.