1,126 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,126 permits
Relocation of plumbing fixtures related to interior renovation of apartment 3e. no change of use, egress or occupancy.
Filing for the installation of a temporary fire sprinkler system for daycare space in cellar and first floors as per plans filed herewith. no change in egress, use or occupancy.
Erect non-illuminated projection banner non-flashing, non advertising sign barney brown as per drawing file herewith.
Structural modifications on floors 2-7 and associated slab removals as per plans filed herewith. No changes in use, egress or occupancy.
Suspended Scaffold for Inspection as Shown on Plans
Installation of non-load-bearing partitions as per plans. change of use, egress, and occupancy on l50 (construction 30)construction floors 30, 33 & 34 (tenant levels 50, 53 & 54).
Plumbing and sprinkler work for the fit out of an apartment as per plans filed herewith. no change in use, egress, oroccupancy
Suspended scaffold for facade restoration as shown on plans
Renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Chapel & sacristy- removal and installation of interior partitions to reconfigure existing bathroom. no change in use, egress or occupancy. see comments.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Storage - removal and installation of sprinkler heads and related piping. installation of additonal standpipe main piping, riser and hose racks off existing standpipe water service…
Proposed eleven (11) story + cellar mixed-use building. (Cellar, 001-010 construction floors, 11C/PENM)
Installation of temporary p/m cellar hoist complex as per plans in conjunction with nb construction. no change in use, egress or occupancy. hoist complex shall comply with chapter…
Structural work for the renovation of the existing 68th floor phase 2 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.