1,126 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,126 permits
Filing to modify existing Automatic Sprinkler. Sprinkler system is designed as per NFPA13 as modified by NYC BC appendix Q Scope is only for Commercial & office Building North Cafe…
Proposed twelve (12) story + cellar mixed-use building.
Removal and reconstruction of interior non-bearing partitions, doors and flooring as shown on drawings filed herewith.
Installation of new plumbing fixtures (kitchen equipment) in existing restaurant. application filed to address ecb 39167816k (wwp) and in conjunction with m01260395-i1 (gc) and m01…
Installation of suspended scaffold for facade work or inspection.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary construction fence as per plans in conjunction with nb construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc buil…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Proposed installation of temporary light duty pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress u…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Structural alterations on the roof level in conjunction with proposed full building renovation and tenant fit-out; related work as per plans. No proposed change in building use, eg…
Modification to existing mechanical system to include hvac replacement and replacement of associated ductwork for tenant (bar soleil). no change to use, egress or occupancy.
Plumbing modifications taking place on 41st floor construction (61st floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.