1,314 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,314 permits
Installation of a temporary heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this…
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.
Interior renovation of 3rd floor commercial space. Work to include minor non structural demolition. no change in use, egress and occupancy
Mechanical modifications as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, egress or occupancy. Filed in conjunction with DOB Now…
Installation of construction fence shed as per plan. no change in use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…
Installation of plumbing fixtures as per plans filed herewith, no change to use, egress or occupancy
New slab openings and infill. install new elevator core and stair bulkhead. reinforce existing floor framing. work on floors 01-03 & roof. filed in conjunction with alt-co #m009729…
Relocate stairs from cellar to first floor.
Installation of temporary support system at existing chimney as per plans.
Installation of new Plumbing fixtures and modifications to Sprinkler Systems as per plans filed herewith for 49th floor (Construction), 69th floor (Marketing). No change in use, eg…
Remove and install hvac equipment in conjuncton with alt-co #m00972936. work on floors 1-3, rof.
Soe work in conjunction with alt-co #m00972936.
Install of temp truss structure, no alt to exist structures for Michael Vinyl Record Installation. A TPA not required. Producer is responsible to monitor site safety & implement HW…
Installation of temporary overhead protection as per plans. no change in use, egress or occupancy.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary beta max hoist as per plans. no change in use, egress or occupancy.