1,314 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,314 permits
Hereby filing to modify and install mechanical units with associated ductwork and piping for tenant modifications as shown on plans filed herewith. No change to use, occupancy or e…
Seabury hall - removal and installation of interior partitons and finishes. new elevator shaft walls. no change in use, egress or occupancy.
Temporary standpipe work related to the construction of a new 50 story commercial building as per plans filed herewith. filed in conjunction with nb #m08018629.
Modify Existing Sprinkler system, remove heads and install heads as indicated on partial 12th floor. No change to egress, occupancy or use.
Installation of suspended scaffold for facade work and/or inspection. Amend #1, added scaffold drops and anchor tr1
Chapel & sacristy - modification of hvac and installation of air handler.
Lorillard hall - removal and installation of interior partitions, flooring, and finishes. no change in use, egress or occupancy.
Structural Framing for vault repairs as per plans filed herewith, No change to use, egress or occupancy
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Lidl chelsea - filing herewith for the plumbing work related to a store fit out. there will be no change in use, eggress or occupancy under this appplication.
Interior alterations to existing residential space to include conversion of a bedroom to a bathroom. no change to use, occupancy or egress
Temporary structures for a fashion show. Removed at the end of the programing. No changes to existing structures, use or egress.
Replacement of glass railings on 10th and 12th floor terraces to respond and resolve vate order and violation #07252325ll011do3. no change in use, egress, or occupancy.
The plywood fence at west 20th street and the chain link fence at the back of the building in the court yard,
Hereby filing for the installation of plumbing fixtures. no change to use occupancy or egress.
Modify existing Sprinkler head layout as part of renovation for tenant spaces at 11th floor of existing commercial space. No change to use, egress or occupancy.
Hereby filing to remove and construct interior partitions, ceilings and doors for tenant space as shown on plans filed herewith. No change to use, occupancy or egress.
Herewith filing for interior soft demolition on the 49th (marketing flr 50) and 50th (marketing flr 51) per plans. no change in use, occupancy or egress under this application.
Modification of an existing Verizon site on the roof. Removal of (1) existing generator and all associated mounting hardware. All work in conformance with TPPN 5/98. No change in u…
Filed herewith a temporary 8' wood construction fence