1,314 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,314 permits
Interior renovation for grooming store including installation, modification of partitions with doors, flooring, and ceiling. and minor carpentry work for the display furniture and…
Plumbing work in conjunction with the interior renovation of apartment 2j located on the second floor. the gas meter at cellar shall be shut off by the utility company. no change i…
Installation of a temporary work platform as per plans during general construction work. no change in use, egress or occupancy. work platform shall comply with 2022 nyc building co…
Portion of existing slab to be partially removed for new HSS installation, remove existing curb, new concrete flood curb, new CMU curb.
Removal of fixtures
Installation of suspended scaffolds for facade repair and inspection.
Replacement of lighting in existing ceilings as per drawings filed herewith. No change in use, egress, or occupancy.
Remove all existing air handlers, ceiling and floor mounted airconditioning units with all associated ductwork, terminal boxes,diffusers, grilles, hangers and accessories.c. remove…
General construction modifications taking place on the 3rd floor as per drawings filed herewith. no change in use, egress or occupancy.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio…
Interior Demo at Level 29
Plumbing and sprinkler work for the renovation of the existing 68th floor phase 1 of an existing building as per plans filed herewith. no change in use, egress, or occupancy.
Installation of new non-bearing partitions, new office front and doors, installation of new ceiling and finish as per drawings filed herewith. no change in use, egress or occupancy…
Plumbing modifications on floors Cel, 1-3 as per plans filed herewith. No changes in use, egress or occupancy.
Modifications of existing sprinkler system
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Video Wall Support Structure with Technician Access Structures installed for less than one year.
Facade repairs as shown on plans