1,314 issued permits in Chelsea-Hudson Yards, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,314 permits
Sprinkler modifications taking place on 41st floor construction (61st floor marketing) as per plans filed herewith. no change in use, egress, or occupancy.
Interior renovation on first floor as indicated on plans filed herewith. no change in use egress or occupancy under this application
Lorillard hall - facade restoration including localized brick and brownstone masonry repairs, minor roof maintenance, stained and leaded-glass window restoration. no change in use,…
Filing herewith modification to an existing sprinkler system as per plans on 17th floor. No change to use, egress or occupancy.
Installation of a heavy sidewalk shed to include storage.
Install new mech & kitchen exhaust sys for exist. commercial space (eating & drinking establishment). app filed to address ecb 39167817m (wwp). app filed in conj w/m01260395-i1 (gc…
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Replacement of AC units on the cellar and mezzanine level as indicated on drawings.
Mechanical work as shown on plans.
T-Mobile - Relocation of existing antennas and sector, removal of microwave dish (NY01083B) as per plans. All work is in compliance with TPPN 5/98 & BB 11/21. No change to use, egr…
Masonry Facade repairs as per plans.No change to use, occupancy, or egress.
Temporary structures for IAC event programming in the multipurpose room. Removed at the end of the programing. No changes to existing structures, use or egress.
Plumbing work on the cellar level (Spear Street Capital) as indicated on drawings.
General construction on the cellar, 1st to 4th floor and roof as plans filed herewith. no change in use, egress, or occupancy.
Installation of a pipe scaffold.
Subsequent filing for mechanical work for daycare space as per plans filed herewith.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
mechanical modifications on 14th floor as per plans filed herewith. No change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy.