1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Structural portion of interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application…
Modifications to the existing Standpipe system on the 27th Floor (Cliffwater), as per plans. No change to use, egress, or occupancy.
Installation of a temporarily heavy-duty sidewalk shed and material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/…
Interior fit out of tenant 53rd floor, including non-load bearing partitions, interior finishes and core toilet rooms. ALT CO filed under separate application.
Filing herewith drawings indicating modification of the Sprinkler System on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under t…
Installation of a new HVAC system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
NYC DEV HUB Consultation 7.30.2025. This application filed for the temporary removal of the structures in the plaza to allow for other work on the lot to occur. All structures will…
Suspended scaffold plans for facade repairs and inspections
Minor interior renovation of apartment 7e. no change in use, egress, occupancy.
Modification to the existing sprinkler system on the 27th Floor (Cliffwater), as per plans. No change to use, egress, or occupancy.
Modification/addition to sprinkler system and related piping as shown on drawings. No change in use, egress or occupancy.
Filing herewith drawings indicating modification of the Plumbing on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under this appl…
Filing herewith drawings indicating modification of the Sprinkler System on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under t…
Mod. of Verizon site. Remove 6 antennas, 4 RRHs, 1 dist. box, 8 braces, 3 MDBs, & 3 cabinets. Replace 5 antennas, 1 antenna w/2 stacked antennas, 4 RRHs, & 2 dist. boxes. Install 6…
Split apartments on 33rd floor. removing interior double-egress doors and installing two typical apartment fireproof entrance doors
Installation of new temporary core sprinkler protection system inaccordance with buildings bulletin 2020-012.
Hereby filing for the replacment and installation of plumbing fixtures. no change to use occupancy or egress.
Plumbing work filed in conjunction with GC application for bathroom renovation
Removal of interior partitions, ceilings, finishes as per plans. No change in use, egress or occupancy,
Installation of a new sprinkler system on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.