1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Split apartments on 33rd floor. removing interior double-egress doors and installing two typical apartment fireproof entrance doors
Plumbing work filed in conjunction with GC application for bathroom renovation
Filing herewith drawings indicating modification of the Plumbing on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under this appl…
Installation of new fire hose cabinet on the 31st floor (ARES) as per plans. No change to use, egress or occupancy.
Convert existing 13th floor commercial office use to residential as the first of two phases. obtain new certificate of occupancy. no change bulk change is proposed.
Removal of interior partitions, ceilings, finishes as per plans. No change in use, egress or occupancy,
New sprinkler heads at existing rectory at 5th floor. connect to existing sprinkler riser.
Hereby filing for the replacment and installation of plumbing fixtures. no change to use occupancy or egress.
Filing herewith drawings indicating interior renovations on the 17th floor construction (marketed as the 18th floor). No change in use, egress, or occupancy under this application.
Filing herewith drawings indicating modification of the Mechanical system on the 17th floor construction (marketed as the 18th floor). No change in use, egress, or occupancy under…
Installation of sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this appl…
Sprinkler/Standpipe work for tenant Metropolitan Capital Partners on 9th floor.
Filing plumbing and sprinkler as per plans. no change in use, egress or occupancy,
Plumbing work for tenant Metropolitan Capital Partners on 9th floor.
Installation of suspended scaffold during facade inspection repair.
Installation of suspended scaffold for facade work or inspection.