1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Modification/addition to plumbing fixtures and related piping as shown on drawings. No change in use, egress or occupancy.
Installation of swing stage scaffolding as per plan and in accordance with Chapter 33 of NYC Building Code. No change in use, egress, or occupancy.
Use of temporary mini crane construction equipment as per plans filed herewith.
Interior renovations of existing commercial space as per plans herewith filed.
Filing herewith drawings indicating interior renovations on the 25th floor construction (marketing as the 26th floor). No change in use, egress, or occupancy under this application…
Facade repairs as indicated on drawings . there is no change to use, egress, or occupancy
Filed for interior demolition of the second floor. no change in use or occupancy.
inspect window and frames
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at east 54th street, entrance of east 54th st,3rd avenue, an…
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy.
Facade repairs as per drawings . there is no change to use, egress, or occupancy
The application is filed for general construction work of a 2,000 sf apartment. Minor plumbing and mechanical work filed separately. No change in use, bulk, egress, or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Interior alterations of existing 35th floor commercial space to include non-load bearing demolition. no change to use, occupancy or egress
Removal of existing ductwork, diffusers, fans, and related mechanical piping, as per plans. no change to use, egress or occupancy.
Installation of sidewalk shed in accordance with nycc 2022 chapter 33 building codes. no change in egress, use, or occupancy.
A wet pipe sprinkler system extending from the existing zone control in the stairwell at level 23 to provide proper coverage as required, in coordination with architectural layout.
Facade work on the 1st through 32nd floor; roof work as indicated on drawings.
Plumbing work @ partial 3rd & 4th floor plan(apts. #3b & 4b) in an existing 4 story w/ cellar building. no change in use egress or occupancy