1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Plumbing fixtures remove a washer/dryer and add a lavatory. No change to use egress or occupancy.
Plumbing work @ partial 3rd & 4th floor plan(apts. #3b & 4b) in an existing 4 story w/ cellar building. no change in use egress or occupancy
Filing plumbing and sprinkler as per plans. no change in use, egress or occupancy,
Filing herewith drawings indicating interior renovations on the 25th floor construction (marketing as the 26th floor). No change in use, egress, or occupancy under this application…
The application is filed for plumbing work of a 2,000 sf apartment. Minor general construction and mechanical work filed separately. No change in use, bulk, egress, or occupancy.
Domestic cold water, waste, and vent piping extending from the main plumbing risers at the toilet rooms to feed new plumbing fixtures as part of the renovation. Point of use tankle…
Installation and modification of plumbing fixtures and associated piping on the 27th Floor (Cliffwater) as per plans. No change to use, egress or occupancy.
Interior build out of 1st flr commercial space, including install of non-load-bearing partitions, storefront glazing/doors within existing openings, soffits, finishes, lighting, an…
Facade work on the 1st through 32nd floor; roof work as indicated on drawings.
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
Modifications to the existing Mechanical Systems on the 7th and 15th floors to include ductwork and new equipment as per plans. No Change to Use, Occupancy Group, or Egress.
Interior and exterior renovation of an existing single family townhouse. New bulkhead and horizontal extension proposed.
Hereby filing interior renovation for tenant fit out of an existing commercial space. no change to use occupancy or egress.
Filing herewith drawings indicating modification of the mechanical system on the 33rd floor construction (marketing as the 34th floor). No change in use, egress, or occupancy under…
Modifications to the existing HVAC system and associated ducts and piping and installation of new units on the 27th Floor (Cliffwater), as per plans. No change to use, egress, or o…
Modification to existing plumbing and sprinkler systems and fixtures and head. No changes in use, egress or occupancy.
Installation of pipe scaffold as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Propose new non-illuminated steel letters on aluminum panel for existing commercial space. no change to use, egress or occupancy.
Alterations to the 7th and 15th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy or Egress.