1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Interior renovation of the 27th Floor (Cliffwater), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Interior and exterior renovation of an existing single family townhouse. New bulkhead and horizontal extension proposed.
Modifications to the existing Mechanical Systems on the 7th and 15th floors to include ductwork and new equipment as per plans. No Change to Use, Occupancy Group, or Egress.
Modification to existing plumbing and sprinkler systems and fixtures and head. No changes in use, egress or occupancy.
Filing herewith drawings indicating modification of the mechanical system on the 33rd floor construction (marketing as the 34th floor). No change in use, egress, or occupancy under…
Installation of suspended scaffold for facade work or inspection.
Duct work modifications as per plans.
Modifications to the existing HVAC system and associated ducts and piping and installation of new units on the 27th Floor (Cliffwater), as per plans. No change to use, egress, or o…
Interior alterations to include non-load bearing demolition, partition and finishes work. no change to use, occupancy or egress
Interior Alterations to the 26th and 27th floors as per plans submitted herewith. No Change to Use, Occupancy, or Egress.
Level 23 installation of new ducted hvac systemconnected to existing building air handling units,installed in coordination with architectural layout.existing perimeter induction un…
Installation of IRA during facade inspection.
Mechanical work as shown on plans filed herewith.
Propose new non-illuminated steel letters on aluminum panel for existing commercial space. no change to use, egress or occupancy.
Alterations to the 7th and 15th floors to include General Construction work as per plans submitted herewith. No Change to Use, Occupancy or Egress.
Hereby filing repair of the existing concrete slab and steel beam encasement from below, and remediation at the existing parking garage expansion joint from above as shown on plans…
Modifications to the existing Mechanical systems on the 25th and 26th construction floors as per plans submitted herewith. No Change to Use, Occupancy or Egress.
Removal and construction of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy.
Sprinkler head changes as indicated on plans,
sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.