1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Mechanical modifications to take place on the 20th floor as per plans filed herewith. No Change in use, egress, or occupancy.
Install an accessory business set of halo lit channel letters with flanged background panel - sign b
Interior renovation of the 32nd Floor (EQT Partners), including interior partitions, doors, ceilings and finishes, as per plans. No change to use, egress, or occupancy.
Modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Modification to existing Sprinkler system and plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Installation of new sprinkler heads and associated piping on the 46th floor (Rooftop Amenity) as per plans. No change to use, egress or occupancy.
Remove & replace fixtures in core restrooms. Furnish and install new plumbing fixtures and related piping in pantry & wellness room. Furnish and install sprinkler main, branch pipi…
Modifications to the existing HVAC system and associated ducts and piping on the 32nd Floor (EQT), as per plans. No change to use, egress, or occupancy.
Interior renovation of existing retail store to deli store. Remove and install plumbing fixtures as per plans. No change in egress, occupancy or use is involved under this applicat…
Removal of sprinkler heads; install temporary sprinkler loop on the 20th floor as indicated on drawings.
(cellar/ 1st/ 2nd/3rd floor) replace / install plumbing fixtures-as per plans -no change to egress use
Interior renovation of existing retail store to deli store. Remove and install partition walls, refrigeration units, exhaust system, finishing floor, walls and ceiling as per plans…
Structural framing and stair opening, as per plans. No change to use, egress, or occupancy.
New alt2 application for general construction work to be performed in existing unit 1C on the bas, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per plans.…
Corridor and bathroom modifications
Conversion of dominant occupancy of building from offices to R-2 residential in accordance with the provisions of ZR Article I Chapter 5.
Plumbing modification in existing residential units as per plan.