1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
sprinkler work as shown on plans filed herewith. No change in use, egress or occupancy.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Removal and construction of interior partitions, doors and ceiling as shown on drawings. No change in use, egress or occupancy.
Sprinkler head changes as indicated on plans,
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Filing for interior reno for 17th floor prebuilt office space as per plans submitted herewith. no change to use, egress, or occupancy.
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Kenneth Cole
Filing for mechanical work associated with interior reno of 19th floor summit tx office as per plans submitted herewith.
Filing herewith mechanical filing as per plans. no change in use, egress or occupancy.
Filing herewith for interior fit out as per plans. no change in use, egress or occupancy.
Installation of new plumbing fixtures and associated piping on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Modification of existing sprinkler system on 27th floor office space as per plans. no change to use, egress or occupancy.
Plumbing work including in-kind replacement of kitchen sink, bathroom sink, and toilet. no change in the location of replaced plumbing fixtures. no change in use, egress, or occupa…
Plumbing work filed in conjunction with GC application for bathroom renovation
Installation of suspended scaffold for facade inspection/repair.
Nterior renovation @ partial 3rd & 4th floor plan(apts. #3b & 4b) in an existing 4 story w/ cellar building. no change in use egress or occupancy
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Plumbing Fixture changes as indicated on plans.
Slab reinforcement for new mechanical openings