1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Installation of suspended scaffold for facade work or inspection.
Nterior renovation @ partial 3rd & 4th floor plan(apts. #3b & 4b) in an existing 4 story w/ cellar building. no change in use egress or occupancy
Slab reinforcement for new mechanical openings
Modification to existing HVAC systems as per plans filed. No change in use, egress or occupancy.
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Temporary roof protection at adjoining properties during bldg alteration, filed sep. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress u…
Filing herewith drawings indicating interior renovations on the 22nd floor construction (marketed as the 23rd floor). No change in use, egress, or occupancy under this application.
Structural support for new MEP equipment including slab reinforcement on the 31st floor (Ares- Buildout Phase) as per plans. No change to use, egress or occupancy.
Modification to the existing HVAC system on the 22nd floor (ACP Office) as per plans. No change to use, egress or occupancy.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 31st floor (Ares- Buildout) as per plans. No change to use, egress or occupancy.
Temporary construction fence beyond curb line filed in conjunction with nb#121253785
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Interior structural modifications to include slab opening infill. no change to use, occupancy or egress
standpipe work as shown on plans filed herewith. No change in use, egress or occupancy.
Sprinkler work as shown on plans filed herewith.
Removal of exist and installation of new HVAC system as per plan filed herewith. No change in use, egress and occupancy.
Installation of plumbing fixtures and related piping on 27th floor office space as per plans. no change to use, egress or occupancy.
Installation of construction fence to protect the site during construction .