1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Sprinkler work as shown on plans filed herewith.
Filing herewith drawings indicating interior renovations on the 21st floor construction (marketed as the 22nd floor). No change in use, egress, or occupancy under this application.
Modification to sprinkler system as per plans.
General interior renovation of apartment 54A. Partition and finish changes. No change in Use, Occupancy or Egress.
Interior bathrooms renovation of duplex apartment 15/16C, as per plans . No change of use, of occupancy, or egress.
Facade repairs and maintenance as shown on drawings. no change to occupancy, use, egress or bulk.
Facade repairs as per plans been filled herewith.
General construction and facade modifications taking place on floors 2-21 and roof as per drawings filed herewith. no change in use, egress or occupancy.
Construction fence as per drawings. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. dot permits by others f…
Temporary roof protection at the adjoining properties as per plans. roof protection shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this applica…
Plumbing modifications as per plans. no change in use, egress or occupancy.
Installation of temporary construction fence per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Proposed to repair existing facade, no change in occupancy, use and egress under this application
Installation of temporary plywood fence as per plans. no change in use, egress or occupancy.
interior renovation of apt 41-B, no change of use, egress or occupancy.
Apartment interior renovation including plumbing fixtures, ceiling soffits, kitchen countertop, and wall paints. no change in use, egress, and occupancy.
Proposed installation of pipe scaffold for new building as per plans. no change in use occupancy or egress under this application.
Installation of suspended scaffold for facade work or inspection.
Use of temporary mini crane construction equipment as per plans filed herewith.
Minor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 22nd floor (ACP Office Buildout). No change to use, egress or occupancy.