1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Modifications to existing mechanical systems. no change to use, occupancy or egress
Remove & replace fixtures in core restrooms. Furnish and install new plumbing fixtures and related piping in pantry & wellness room. Furnish and install sprinkler main, branch pipi…
Installation of a temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applic…
Hereby filing demolition of interior non-bearing partitions and related finishes. no change in use, egress or occupancy.
Renovation of a commercial space including installation of new type ii commercial kitchen hood, exhaust fans, makeup air unit, water source heat pumps with ductwork, and cooling to…
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Structural modifications on floors 31 and 32 as per plans filed herewith and associated infill of existing convenience stair. No changes in use, egress or occupancy.
Interior alterations of existing 40th floor commercial office space. no change to use, occupancy or egress
Modifications to existing plumbing and sprinkler systems. no change to use, occupancy or egress
Plumbing Fixture changes as indicated on plans.
New plumbing fixture per plan for existing commercial space. Modification of existing sprinkler system. No change in use, occupancy or egress.
Split apartments on 33rd floor. removing interior double-egress doors and installing two typical apartment fireproof entrance doors
Interior demolition/removals of ductwork, AC units, VAV's and piping as per plans filed herewith. No change to use, egress, or occupancy.
Installation of temporary roof protection & overhead protection over adjacent property as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change…
plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Removal of interior non-load bearing partitions and related finishes as per plans. no change in use, occupancy or egress.
Interior alterations to lobby and 2nd floor space. no change to use, occupancy or egress
Proposed interior renovation including existing kitchen, living area and bathroom. Proposed electrical panel upgrade. Proposed conversion of tub to shower. Plumbing shall be filed…
Installation of temporary pipe scaffold as per plan. no change in use, egress or occupancy.