1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Combining two units 20a and 20d on the 20th fl, interior renovation, pl work under subsequent filing
Temporary work platform as per drawings. work platform shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Application filed for plumbing work of existing apt 22j in residentialbuilding. work includes:- new toilet and vanity in existing rough.- no change to use, occupancy, or egress.
Reno. duplex apartment (2nd/3rd floor), new paritions-reconstruction stair existing opening- finishes-fixtures-renovation bathrooms new kitchen layout/ appliances new recessed ligh…
Misc. Repair or Replacement of Brick Masonry, Steel Lintels, Concrete Sills and repair / patching of projecting Concrete Balconys and Terraces. No change to Occupancy or Egress. No…
Installation of ductwork, ac units, diffusers, fans, and related mechanical piping on 27th floor office space per plans no change to use, egress or occupancy.
Interior renovation of existing commercial space. Walls, door, fixtures as per plan. No change in use, occupancy or egress.
Installation of pipe scaffolding and heavy duty sidewalk shed as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupanc…
Modification of plumbing system as shown on plans
Facade repairs as indicated on the plans filed herewith. no change in use, egress, or occupancy.
Sprinkler modifications on the 20th floor as per plans filed herewith. No change to use, egress, or occupancy.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 17th floor as indicated on drawings.
Removal of plumbing fixtures on the 17th floor as indicated on drawings.
Interior renovation to include demolition of existing and construction of new partitions. no change in use, egress, or occupancy.
Modifications to existing plumbing and sprinkler systems in existing 37th and 38th floor office space. no change to use, occupancy or egress
Minor partition work and installation of new wood finish floor. renovation of kitchen and new finishes in bathrooms
Structural work filed to install new steel lintels, masonry infill and slab repair.
Miscellaneous renovations in apartment 48D, 48th floor. Work to include non structural demolition, new ceilings, new flooring and finishes throughout. no change in use, egress nor…