1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Convert existing office into residential units on 2nd to 14th floor as per plan. and obtain new c of o.
Plumbing work filed herewith as shown on plans.
Masonry facade repairs as per plans. No change in use, egress or occupancy.
Relocation of existing gas head of service valve & gas meter, which will require a gas service/meter room to be constructed within a portion of the existing family locker room as p…
Plumbing work filed in conjunction with interior renovation & combination of existing aparments as per plans filed. no change in use, egress or occupancy.
Structural modifications taking place on the Roof as per plans filed herewith. No change in Use, Egress or Occupancy.
Mechanical work as per plans. No change in use, egress or occupancy.
Interior alteration to existing apt. 6b on the 6th floor. general construction work, demolish and construct non-structural interior partitions, doors, finishes. renovate ex. bathro…
Facade repairs as per plans filed herewith. no change to use, egress or occupancy.
Mechanical demolition on the 17th floor as indicated on drawings.
Submit emergency generators plan in conjunction with alt-1 application#m01109601-i1.
interior demolition on 13th and 14th floor as per plans filed herewith. No change in use, egress or occupancy,
Installation of industrial rope access for facade inspections.
Temporary pipe scaffold as per drawings. scaffold shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
WCM Lobby, Cellar; Plumbing, Sprinkler work to accommodate the Primary Care Renovation in the existing building.
Brick replacement, lintel replacement, parapet rebuilding, brick corner rebuilding, steel reinforcement, terra cotta replacement, guard rail and railing installation at the bulkhea…
Interior renovaition on 27th floor office space as per plans. no change to use, egress or occupancy.
Suspended Scaffold Installation as per plans filed herewith. No change in egress, use or occupancy.
Herewith filing for structural modifications on the ceiling of the 50th floor in conjunction with interior renovations per plans. no change in use, occupancy or egress under this a…
Provide slab infill and support on 7th floor