1,081 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,081 permits
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Interior renovation of an existing apt12e on 12th floor of an existing residential building. no change in occupancy,use or egress.
sprinkler work as shown on plans filed herewith. No change in use egress or occupancy.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Removal and installation of interior partitions and finishes as per plans. Area of 1st floor increased by 470SF. Floor area relocated from 6th floor (filed under M01006077-I1). No…
Modifications to existing sprinkler system on 12th floor (north) per plans. No change to use, egress or occupancy.
Structural work as per plans
Filing for sprinkler work associated with the interior renovation of 11th & 12th floors for peerless clothing as per plans submitted herewith.
Structural work as per plans including: support of slab openings for MEP, support of new interior storefront and support of new garage doors.
mechanical work as shown on plans filed herewith. No change in use egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Combination of apts 11c and 11d as per tppn 3.97 and as per plans filed herewith. no change to use, egress or occupancy
Removal and installation of plumbing fixtures and associated piping for the 8th floor office space as per plans. no change to use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Removal and installation of interior partitions and finishes at the 6th floor and new elevator openings at 7 & 27th floors. No change in use, egress or occupancy.
Exterior Facade work as per plans. No change in use, egress or occupancy.
Mechanical work as per plans. No change in use, egress or occupancy.
Installation of outrigger for facade repair & inspection.
Plumbing work as shown on plans.
Installation of temporary shoring in limited areas of the cellar and first floor. No change to use, egress and occupancy