1,431 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,431 permits
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed at east 54th street, entrance of east 54th st,3rd avenue, an…
Installation of temporary sidewalk shed as per plan. no change in use,egress or occupancy.
Installation of temporary beta hoist as per plan. no change in use,egress or occupancy.
Plumbing work to replace existing fixtures in kitchen and bathroom and install new fixture in laundry closet.
Installation of pipe scaffolding per plans. pipe scaffolding shall comply with chapter # 33 of the nyc code, no changes in use in egress or occupancy under this application.
Mechanical changes as indicated on plans.
Facade repairs. No change to use, egress or occupancy.
Filing for architectural work to create new rooftop amenity space per ZRD 1 appeal #PDA00001445.
Hereby filing to remove and install new plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Interior demo & reno of non-load bearing partitions, walls, doors, frames, ceiling &n finishes as indicated on plans.
Installation and use of temporary knuckleboom as per plans filed herewith. no change in use egress, or occupancy.
sprinkler work as shown on plans filed herewith. No change in use egress or occupancy,
Hereby filing to remove and install plumbing fixtures with related piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Installation of suspended scaffold for facade work or inspection.
Plumbing work from the 32nd to the 34th floors as plans filed herewith. no change in use, egress or occupancy.
Mechanical work from the 32nd to the 34th floor as plans filed herewith. no change in use, egress, or occupancy.
Interior renovation, new walls, new floors, new kitchen & bath , on 3rd floor apartment 3b and 4th floor apt 4c