1,429 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,429 permits
Installation of heavy duty sidewalk shed as per plans. no change in use occupancy or egress under this application. sidewalk shed shall comply with chapter 33 of the 2022 nyc build…
Modifications to existing plumbing and sprinkler systems in 6th floor commercial office space. no change to use, occupancy or egress
Installation of heavy duty sidewalk shed as per plans in compliance with chapter 33 of nyc bc. no change in use, egress or occupancy under this application
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Renovation of office with addition of door on Lower Level 2 (Sub-Cellar #1 per CO). No change in use, egress or occupancy.
This application filed herewith for a temporary use permit for model apartments on the 7th floor pursuant to section ac 28-111 and buildings bulletin 2010-002. no change in occupan…
Installation of 7,100 lb single personnel hoist cars as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy u…
Plumbing Fixture changes as indicated on plans.
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Removal of section of steel beam web and provide structural reinforcement at the new opening no change to use, egress or occupancy.
Installation of temporary roof protection, overhead protection and window protection as per plans. temporary protection shall comply with chapter #33 of the 2022 code. no change in…
Interior renovaition, installation of new non-load bearing walls, doors, wall and floor finishes, ceilings and millwork on 8th floor office space as per plans. no change to use, eg…
Interior alterations to include non-load bearing demolition. no change to use, occupancy or egress
Filing herewith office renovation as per plans.
Modifications to existing plumbing and sprinkler systems in 8th floor commercial office space. no change to use, occupancy or egress
Renovate/combine existing apartment, partitions, flooring, cabinetry, counters, doors, ceiling, fixtures & finishes. no change in use, egress or occupancy.