Proposed garage repairs as indicated on plans submitted herewith. there is no change in use, egress or occupancy.
Installation of a temporarily heavy-duty sidewalk shed and material storage per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/…
Plumbing work filed in conjunction with interior renovation @ partial 2nd & 3rd floor plan(apts. #2bc ,3b & 3d). no change in use, egress or occupancy.
To relocate exhaust fan and its grease duct on roof for basement commercial kitchen with mechanical work as per plan filed herewith. no change of use, egress or certificate of occu…
Installation of new non-load bearing walls, doors, wall and floor finishes, ceilings, and millwork and removal of floor finishes on 20th floor office space as per plans. no change…
Removal and installation of interior non bearing partitions and related finishes as per plans filed herewith. No change in use, egress or occupancy under this application.
Ventilation system/ducts and piping
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 9th floor (suite 904) as per plans filed herewith. no change in use, egress,…
Installation of temporary construction fence/enclosure system as per drawings. fence enclosure shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under t…
Demolition of existing non-load bearing partitions, doors, millwork, ceilings, plumbing, mechanical, electrical, in addition to all existing finishes throughout. New work to consis…
Modifications to the existing plumbing system per plans filed herewith. No change in use, egress or occupancy.
Installation of work platform as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Mechanical modifications taking place on the 32nd floor as per plans filed herewith. No change in use, egress or occupancy
Combination and renovation of two adjacent dwelling units to create a 3-bedroom, 2 bath apartment. No change to Use Egress or Occupancy. No change to C of O required as per Local L…