1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Removal of existing sprinkler system with installation of a temporary loop on the 14th floor as per plans. No change to use, egress or occupancy.
Interior renovations as per plans filed herewith. No change to use, egress, or occupancy.
Installation of temporary 2500 # capacity, material only, chain fall system as per drawings. chain fall system shall comply with ch #33 of the nyc bc. no change in use, occupancy o…
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 10th floor (copycats) as per plans filed herewith. no change in use, egress,…
Sprinkler Modifications to the 6th floor as per plans filed herewith. No change in use egress or occupancy.
Plumbing Fixture changes as indicated on plans.
HVAC removals on the 14th floor as per plans. No change to use, egress or occupancy.
Install Air Conditioning & Transfer Air Ducts & Grilles, Volume Dampers, Supply Air Diffusers, Return Air Grilles, Exhaust Fans & Ducts & Replace Insulation on Existing H.P. Duct o…
Removal and disposal of interior partitions, doors, ceilings and finishes with patch and repair of columns, walls and floors on the 14th floor as per plans. No change to use, egres…
Hereby filing Supplemental support for lobby partition alteration as shown on plans filed herewith. No change to use, occupancy or egress.
Hereby filing modification of interior storefront as indicated on plans filed herewith. No change to use, occupancy or egress.
Mechanical changes as indicated on plans.
Installation of suspended scaffold for facade restoration as shown on plans
Hereby filing removal of non structural partitions & ceilings. new non-structural partitions, ceilings & plumbing to achieve code-compliant men's & women's rooms as shown on plans…