1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Temporary Standpipe work as per plans.
Modifications to the existing HVAC system on the 1st floor (Cala Scarpetta) as per plans. No change to use, egress or occupancy.
Decommission of existing Future Technologies site. Remove 3 GPS antennas and 1 whip antenna on roof and remove 1 equipment cabinet from 63rd floor radio room.
Existing bathtub to be converted to standing shower - no change in plumbing, zoning, egress, far, access, occupancy or use of building
Modifications to the existing HVAC system (FSD Additions) on the 27th floor as per plans. No change to use, egress or occupancy.
Installation of temporary working platofrm as per plans. platofrm shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Plumbing work filed in conjunction with dob now gc and mh. no change to use, occupancy or egress.
Minor renovation to existing restaurant. occupancy calculations. no change of use, egress or occupancy thru this filing.
Hereby filing to modify ductwork and piping for bathroom renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Interior demo & reno of non-load bearing partitions, walls, doors, ceiling and finishes as indicated on plans.
Hereby filing removal of non structural partitions & ceilings. new non-structural partitions, ceilings & plumbing to achieve code-compliant men's & women's rooms as shown on plans…