1,428 issued permits in East Midtown-Turtle Bay, part of Manhattan, New York. Refreshed every 6 hours from the city's public permit feed.
1,428 permits
Installation of pipe scaffolding as per plans. pipe scaffold shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
1st fl. commercial establishment. erect minor interior partitions, new finishes thru-out, new hung ceiling. new plumbing, hvac filed separately. no change in egress, occupancy, or…
Filing herewith drawings indicating modification of the Mechanical system on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under…
General construction to renovate apt 27b on the 26th floor. work will include new partitions & finishes, and new plumbing fixtures. no change in use, egress, or occupancy under thi…
Filing herewith drawings indicating modification of the Sprinkler System on the 35th floor construction (marketed as the 36th floor). No change in use, egress, or occupancy under t…
Plumbing work for Tokio HCC on 23rd marketing floor (22nd construction)
Underpinning work as per plans filed. Filed in conjunction with NB #121206569.
Filing for plumbing work associated with interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submitted herewith.
Modify sprinkler heads and related piping. No change in use, egress or occupancy.
Application filed for the combination of units 34 efg. this application is filed to comply with tppn 3 of 97. no change of co required.
Modify plumbing fixtures and related piping. No change in use, egress or occupancy.
Plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Sprinkler work on the 11th floor (Tai Ping Edward Fields showroom) as indicated on drawings.
plumbing work as shown on plans filed herewith. No change in use, egress or occupancy.
Structural framing for new hung platform for water heaters and framing to support new hanging MEP units and kitchen equipment on the 1st floor (Cala Scarpetta) as per plans. No cha…
Filing for interior renovation for apartment 3C. Scope to includes demo and retro-fit of the bathroom, and kitchen, installation of new appliances, skim coating and painting all wa…
Material hoist. materials only. no work from hoist.
Interior renovation to include demolition of existing and construction of new partitions in suite 500 for existing office space. no change in use, egress, or occupancy.